— = Progress Made (preliminary actions taken)
Post-PDR (Spring 2026)
Deliverables:
CAD
FEA
Manufacturing
Extras
Resources:
Structural Analysis PDR Mission (Fall 2025)
- (1) Re-do the Box + 2-Node Analysis — compare results
- (2) Box + Node-Per-Component Analysis — are the stats converging with inc. fidelity?
Deliverables
Refined Structural Analysis by November 10
Presentation Slide-Deck by November 10