Teralink-1 has a huge need for MEs to contribute to the following sub teams.
Spacecraft Structures
- assistance with ensuring compliance standards with launch provider, AFRL UNP, NASA.
- helping to conduct and write structural (static, dynamic) analysis reports.
- helping research, procure, and compile structure components, mainly the 6U FRAME.
- directly updating the spacecraft CAD layout (only 1-2 people at a time will hold the full assembly after we start integrating components models.)
- designing mounting & fastening solutions for the components.
Ground Station Structures
- assistance with researching and setting up a field test operation protocol
- helping research, procure, and compile structure components
Thermal Engineering
- assisting in researching & programming multi-node thermal & ME energy analyses for both the spacecraft and high-power components.
- helping research, procure, and compile thermal components like MLI and heatsinks.
- assisting in writing up reports to the clients.
Flight Simulations
- assisting in researching & programming orbital mechanics simulations of various types.